Fieldwork research brief · November 2026

Supervising industrial fleets

A browser simulation for studying what an operator needs to see, decide and physically control over a shift. The first trial combines fleet monitoring, a tactical diversion and a short camera-based intervention in a shared quarry and transfer yard.

Design around interrupted work

Give the operator four places to work. The map answers where assets and conflicts are. The exception queue shows why work stopped, what automation already did, and which decision is due. The task view shows the next consequential step and lets the operator authorize, hold, or revise it. The camera and control area handles execution when a bounded instruction cannot resolve the episode.

With dozens of assets, encode routine status in map geometry and one fleet summary. Keep geometry showing routes, closures, reservations and affected assets below the labels. Label selected or exceptional assets. Use the same asset ID in the queue, map, work order, control grant and every camera. In the queue, group consequences under the episode's cause and rank by time to consequence, then severity. Acknowledging receipt leaves the episode open until the resulting condition has been verified. The prototype shows one exception plus a count and a marker for affected assets.

Walkthrough. HT-27 stops at a blocked crossing. Focus it on the map and assign a lateral pullout. Inspect the destination and review the hold when it arrives. During a separate EX-04 placement, the camera and joystick remain on EX-04 while the operator inspects the truck warning. After releasing EX-04, the operator reviews the held tool and unfinished task before resuming work. The demo scripts this reported blockage at T+18 seconds, or an operator station can trigger it earlier from Experiment settings. The blockage is represented as a reported cause and truck hold.

Display task phase in ordinary language. In supervision, distinguish assigned, executing, blocked and waiting for a decision, with a reason and next action. Use a solid path for the committed plan and a distinct dashed preview for a proposed revision. During manual work retain the current phase and expected handback, and keep the urgent fleet queue visible. Add a searchable shift record and an at-a-glance briefing of live constraints, unresolved exceptions and outstanding handoffs. A shared wall view can show zones and consequences while desks keep their own camera selections.

HSE alarm management · HSE control-room guidance · Cummings and Mitchell, supervisory queueing and reorientation.

Autonomy changes with the operation

AssetSupervised automation to studyBounded intervention to study
Haul truckDispatch, mapped route following, stopping and queueing at crossings, load and dump coordination.Assign a pullout or authorize the next leg. Compare remote steering only for a scenario with that capability. Komatsu FrontRunner illustrates central dispatch and autonomous route following. Komatsu
ExcavatorGuided approach, repetitive work cycle and clearance when outside the work envelope.Align and pick an oversize rock using slew, reach and lift. Model implement authority separately from travel. Underground Cat loaders illustrate assisted guidance and automatic travel and dump. Autonomous excavation is also demonstrated in research. Cat Command · Zhang et al.
Gantry craneWork-order sequencing, pre-positioning and a handoff at the transfer bay.Fine trolley, gantry and hoist motion, with an onboard hold and load retention. Konecranes documents a configuration that hands off container landing at the truck. Konecranes retrofit, pp. 2–3
SnowplowCoordinated route coverage, assigned priority zones and a pass-completion trace.Handle an obstruction or an uncertain lane edge. Compare a map-derived guidance aid with the blade camera. Yeti Move Oslo deployment · MnDOT field deployment

Make the change of authority explicit

A glance should answer three questions. What is the machine trying to do? Who controls each relevant function? Which observations and inputs are usable? For example, show “Lower spreader” as the task phase, “Hoist and trolley · Remote · Station 1” as authority, and “Gantry · Held” beside it. Keep primary camera freshness in the image and the authority state beside the vehicle identity. This is more actionable than one automation level for the whole vehicle. Mode-awareness research provides a reason to test whether operators can name who is in control and predict the next movement. Sarter and Woods

AutomatedRequested / securingArmed at standstillRemote with enable heldHeld for reviewAutomation recommitted

For the study-ready design, use the following transition sequence.

  1. Request control for a named asset and function from the current task. Present the required view and machine pose while securing. Grant exclusively after confirming standstill, adequate view, an available station and a permitted envelope.
  2. With neutral axes, use a deliberate enable gesture. Keep joystick mapping and view placement stable. Show the bound asset independently of any fleet inspection. Protect limits, exclusion zones and load retention in the machine model throughout manual motion.
  3. Release enable to halt motion. Distinguish a requested stop, braking and confirmed hold. Revoke on lost critical view, station disconnect or expiry. Preserve an attached load and protected work area. A recovered link or camera permits another request. It never starts motion by itself.
  4. Review the actual pose, remaining job and proposed rejoin. Commit a validated handback explicitly. A released or failed grant and a cleared exception are separate events.

The first workstation needs mouse or touch for dispatch and inspection, a pair of rate controls for axes, an easily held enable and a separate hold action. For ergonomics trials, compare a standard USB gamepad with calibrated industrial sticks or wheel and pedals as appropriate. Keep axis names, travel/implement profiles, dead zones and control response visible. Test focus loss and stick reconnect. Provide feedback for rejected or pending commands and keep the hold function available while inspecting other work. Industrial designs require domain-specific evaluation under the relevant remote-control and autonomous earthmoving standards. Excavator control by subtask · ISO 15817 scope · ISO 17757 scope

Make contact and clearance visible

Use two stable, named viewpoints whose jobs are different. A centered camera can hide depth along its line of sight, so a side or downward view should answer a specific question. Use shadows, known object sizes, paint edges, joints, recognizable landmarks, tool motion and honest occlusion as depth cues. Camera identifiers include mounting position and orientation. The operator can ask for a view without gaining control. During control, keep the required rig assigned, and show the estimated presentation age of the frame. A reference overview has its own label.

TaskPrimary and auxiliaryWhat should be visible
Travel and pulloutForward mount plus rear clearanceRoad edges, grade and stop marks. Rear view resolves tail swing and distance behind when maneuvering.
Rock handlingCab and boom plus fixed sideBucket teeth, rock contact, tool shadow and pickup/placement area. Test if the raised stick blocks useful view.
Container landingGantry oblique plus spreader downDestination corners and alignment from above. Oblique view resolves height, adjacent structures and occlusion.
Blade trackingForward blade plus kerb edgeBlade edge, snow boundary, road marking and lateral clearance. Distinguish a camera-visible marking from a map-derived guide.

Promote Faceted quarry for a legible industrial landscape with natural material differences, berms and landmarks. Promote Diagrammatic yard to test whether quieter surfaces, a measured grid and stronger target contrast help precise work. Both demos share the authored roads, task objects, collision geometry, viewpoints and kinematics. Treat the first trial as a comparison of complete visual treatments. If the diagrammatic version helps, cross the grid and stronger contrast with both styles to determine what drives the difference. The isometric diorama concept suits overview. A mounted camera preserves occlusion and work-axis depth for manual trials. Use a high-fidelity or recorded view later to test transfer.

Experiments with small samples of remote crane operators provide preliminary support for depth aids such as corner lines and shadows. A separate small latency experiment found uncertain performance benefits for input and motion-prediction overlays. In the first evaluation use intrinsic cues, then test an optional projection independently. Crane depth aids · Crane latency overlay study · Excavator terrain grid and shadows · TNO cameras and interpreted crane world

Camera capacity. Define primary and auxiliary rigs for every equipped asset. Subscribe to selected views and limit simultaneously active thumbnails. The prototype pages through four thumbnails at a time and renders selected views from buffered state on the client. A shift workstation should give the control view first claim on resolution and cadence. A shared camera wall or observer can take out-of-band subscriptions. Measure delivered frame rate and age before assigning camera budgets.

Build one room with independent views

Implemented. Bun serves the app and a WebSocket room. It owns a nominal 20 Hz world step and 10 Hz fleet snapshots, the exclusive room-wide remote lease, task states, fault injection and transition history. Multiple browsers share a room with independent camera and scene choices. The map reads recent state. Three.js samples buffered earlier state for the simulated cameras and labels the source tick and estimated presentation age. Injected delay shifts the sampled time. Freeze holds a historical frame while age grows. The input gate can place the asset in hold when the expected primary frame is stale. Browser and server share the authored site and a metric coordinate conversion. Keyboard and standard Gamepad API input share the bounded axes. Bun WebSockets · Three.js multi-view rendering · Gamepad API

Leitbild map approach. The local checkout at revision 35ddbbb separates self-hosted PMTiles/MVT context from dynamic operational features in native MapLibre sources and layers. Fieldwork uses MapLibre and a small bundled authored GeoJSON site. Routes, zone geometry, obstacles and identity feed both the map and the 3D scene. The local-frame convention in src/core/spatial/local-frame.ts maps east to +X and south to +Z with +Y for height. The counterpart to Leitbild's src/map/scenery-compiler.ts and src/map/scenery-glb.ts is a small road ribbon builder. Outside the pilot, prepare a licensed site extract and optional elevation offline, validate at-grade junctions and widths, then compile surrounding scenery. Author private right-of-way, operating limits and route semantics in a separate scenario graph. Local Leitbild references docs/adr/0004-map-rendering-strategy.md and docs/adr/0011-self-hosted-vector-tile-base-map.md.

Next research increment. Give the facilitator a separate role and a seeded scenario schedule. Separate camera, telemetry and command impairment so experiments can combine stale images with fresh map or control state. Log capture and presentation time, camera ID, actual frame age, command acceptance and application, episode ID, input profile, geometry version and per-tick outcomes. Persist periodic snapshots plus accepted commands for replay and compare repeated states at named ticks. Record how many frames the operator actually saw. Introduce sensor-restricted client data where an experiment tests perception. The pilot reconstructs frames from shared state and trusts browser-reported source ticks.

Add WebRTC when compression, bandwidth contention or actual encoders become factors. Use a relay for shared subscriptions, measure glass-to-glass age, and separate expiring axis samples from reliable decisions. Add rigid-body contact when crane swing, ground response or placement collision become outcome variables. Rapier is a candidate for browser-compatible shared physics. Use specialist simulation or CARLA when the question requires calibrated sensor fidelity, then retain the same operator station and experiment records. WebRTC stats · Rapier determinism · CARLA sensor timing

Prototype boundary. The mixed site is fictional. One EX-04, GC-02, HT-12 and SP-03 hold distinct demonstration tasks, with 24 additional moving haul trucks. The trucks use scripted routes and the two handling machines begin staged. Bucket pickup, crane attachment and parking are simplified kinematics. The plow clears small snow patches by proximity. Fleet vehicle separation, granular material, interlocked human entry, implement dynamics, hardware-in-the-loop and qualified safety functions are later modeling work. The event history is bounded and held in memory. The room is intended for a trusted lab network.

Study a shift under competing demands

  1. Calibrate the tasks. Use a practice layout and criterion training. Ask experienced operators to drive a short pullout, place a rock, land a container and track an edge. Record overshoot, alignment error, clearance, contact and time. Tune only pilot scenarios before freezing the formal protocol. NIST teleoperation test methods
  2. Compare the two appearances. Use a counterbalanced within-participant study with equivalent start poses and placements. Keep lens, view size, lighting direction, response gains, route geometry and prompts fixed. Compare task error and time, then ask which cues supported the judgment. Add the same physical or high-fidelity benchmark for both if studying transfer.
  3. Test the shift. Keep fleet size fixed first. Vary how tightly exceptions cluster and whether one arrives during sustained manual work. Include quiet monitoring and a handoff briefing. Compare clean and impaired feeds in separate scheduled windows. Later compare a goal-level pullout and manual steering for equivalent obstructions. The workload capacity result is a function of intervention duration, overlap, response windows and reorientation cost. Tener et al., assistance and remote driving · Olsen and Wood, interaction effort and neglect tolerance
  4. Instrument what happened. Record the separate times of fault onset, machine hold, queue presentation, first selection, first correct decision, authority grant, first motion, handback and recovery. Count deadline misses, wrong-asset actions, failed requests, manual alignment errors and timeouts. Add a short workload and awareness probe after each block. Keep participant, scenario and order effects in the analysis. Determine the main study size from the pilot variance. NASA-TLX

Decisions from the specialist reviews

ReviewCritiqueDesign disposition
Initial synthesisSupervision, camera, and systems specialists identified separate needs for deciding, observing and executing.Adopt shared operational state with anchored views and bounded control. Promote two styles from a common world.
Cross-specialty critiqueInspection could retarget controls. A frozen image could look plausible while the map continued moving. Camera comparisons could confound geometry and task access.Lock camera and input ownership during the grant. Show age in the camera. Render every object from the same historical frame. Keep geometry and rigs shared, and describe each visual treatment as a bundle.
Implementation reviewAuthority gates need multi-client failure checks. Rendering many feeds competes with the selected view. A scripted fleet demonstrates attention demand only within the authored episode.Exercise competing grants, stale feed, release, held load and explicit handback. Limit gallery work to four slots. Treat site capacity and operator performance as trial outcomes.

The brief draws on published task studies, first-party deployment descriptions and the local Leitbild source. It frames study hypotheses and a reproducible implementation. Operator evaluation remains the next evidence gate.